D9.6 Report on requirement monitoring
- Main information
-
As the final document of WP9 this report lists various revised issues that have been described in separate deliverables in former times. Chapter 3 depicts the relevant actors and roles within the LIVE system. The final usage scenarios that could be observed during the preparation, production and post-processing of the Olympic Trial are described in chapter 4. They were the precondition for the revision of the final requirements presented in chapter 5. The description of the final requirements is oriented towards the presentation of the revised requirements in [LIVE D9.4] and follows the same outline. They again served as a foundation for the revision of the final system architecture of the LIVE production support system. Chapter 6 picks up the already defined workflows from [LIVE D9.5] and adapts and amends them according to the final requirements from chapter 5. This is accomplished by providing a componentbased view on the one hand and more detailed inspections on components which have been subject to major changes on the other. The first part intends to give an overview on the performed adaptations of the architecture for each component. The latter part is meant to serve as a guideline for the developers of the various components and tools on which interfaces will be needed between which components and which data has to be exchanged. No referenced Knowhow defined WP9: Requirements and Systems Specification. IAIS Benjamin Ihle, Heike Horstmann 2009-09-30 11:10 Request for more detail
- Access and Use Rights
-
Condition of access defined in response to "need to access request". Condition of use defined in response to "need to use request".
- Protection Status
-
Copyright LIVE Consortium. Patent Protection not sought. Licensing Protection not sought. Utility Model Protection not sought. Closed, attachment is not public
This item is not available for public download. For further information click on Request for more details above